GE MS-6001B Maintenance Instructions Manual page 75

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Inspection and Maintenance — GEK 107048
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont'd)
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909) (Cont'd)
20.
Union Tube
21.
Union, Tube
22.
Union, Tube
23.
Tee, Union Tube
24.
Nut, Self Locking
25.
Nut, Self Locking
26.
Nut, Self Locking
NOZZLE ARRANGEMENT, TURBINE FIRST STAGE (ML1401)
1.
First Stage Nozzle Arrangement
RING RETAINING, TURBINE NOZZLE FIRST STAGE (ML1401)
1.
Insert, Wire Locking (Helicoil)
2.
Insert, Wire Locking (Helicoil)
3.
Wire, Insert (Helicoil)
4.
Wire, Insert (Helicoil)
SUPPORT RING ASSEMBLY FIRST STAGE NOZZLE (ML1403)
**1.
Insert Wire Locking (Helicoil)
ENCLOSURE TO BASE ARRANGEMENT (ML1605)
1.
Seal, Rubber Strip
2.
Strip
3.
Gasket, Silicone
4.
Gasket, Dryback Adhesive
5.
Gasket, Asbestos
6.
Screw, Machine Round Head (#10-24 x 0.750)
7.
Washer, Plain Regular (.375 Steel Plain Washer)
8.
Bolt, Hex Head (.375-16 x 3.50)
9.
Washer, Rubber
10.
Bolt, Hex Head (.375-16 x 2.50)
11.
Lockwasher, Spring (.625 Steel Spring Lockwasher)
12.
Bolt, Hex Head (.625-11 x 2.00)
13.
Nut, Hexagon (.625-11)
14.
Bolt, Hex Head (.250-20 x 0.750)
BOLTING AND DOWELING ARRANGEMENT (ML1604)
1.
Bolt, Twelve Point Head (Compressor Discharge Casing to Turbine Casing)
Standard Practices
Recommended
Quantity
2
4
7
2
*5
*6
*6
1
4
9
30
1
18
2
1
1
1
1
*5
*20*
*15*
*16*
*4
*12*
*4
*8
*8
*8
SP-49

Advertisement

Table of Contents
loading

Table of Contents