GE MS-6001B Maintenance Instructions Manual page 74

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Standard Practices
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont'd)
PIPING ARRANGEMENT PRIMARY FUEL GAS (ML0911) (If Applicable To Unit)
**1.
Gasket (Gas Line Flange to Fuel Nozzle)
**2.
Gasket (Gas Line Flange to Gas Manifold Flange)
3.
Bolt, Hex Head (Fuel Nozzle and Gas Manifold Flange)
4.
Nut, Self Locking (Fuel Nozzle and Gas Manifold Flange)
PIPING ARRANGEMENT (PRIMARY SECONDARY TRANS.) FUEL GAS — (SAME AS PRIMARY FOR
PARTS)
PIPING ARRANGEMENT COOLING AND SEALING AIR (ML0909)
Note: The list of gaskets, nuts, bolts and connectors male and female shown
below with varying quantities, indicates that there are different sizes
required. Using the applicable piping arrangement cooling and sealing
air piping arrangement drawing, the user should procure the gasketing
quantities shown and approximately 20% of the hardware quantities
shown to cover any hardware which may not be reusable.
**1.
Gasket
**2.
Gasket
**3.
Gasket
**4.
Gasket
**5.
Gasket
6.
Locking Plate, Nut & Bolt
7.
Bolt, Hex Head (.500-13 x 2.25)
8.
Bolt, Hex Head (.625-11 x 3.00)
9.
Bolt, Hex Head (.625-11 x 3.25)
10.
Bolt, Hex Head (.750-10 x 3.75)
11.
Bolt, Hex Head (.750-10 x 10.50)
12.
Connector, Male
13.
Connector, Male
14.
Connector, Male
15.
Connector, Male
16.
Connector, Tube Female
17.
Elbow, Union
18.
Elbow, Union
19.
Elbow, Union
SP-48
Inspection and Maintenance — GEK 107048
Recommended
Quantity
10
10
*16*
*16*
5
5
8
6
4
*10*
*4
*15*
*8
*4
*8
2
1
2
10
1
3
2
7

Advertisement

Table of Contents
loading

Table of Contents