Electric Release Test; “Puff” Test - GE MS-6001B Maintenance Instructions Manual

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Inspection and Maintenance
Two separate tests are necessary to ensure that the low-pressure CO
are (1) the electric release test and (2) the "puff" test.

Electric Release Test

Check the wiring in the circuit by short-circuiting each fire detector in turn. Each time this is done,
solenoid valve 45CR should energize. Before performing the Electric Release test, the system must
be disabled by means of the isolation valve in the control cabinet.
"Puff" Test
The "puff" test consists of discharging a small amount of CO
the operation of the release mechanism and to be sure that all pressure-operated latches and ventila-
tion dampers operate properly. Conduct the test as follows:
1. Inspect the ventilation dampers in the accessory and turbine compartments and latch them in the
open position with the CO
2. Check to see that solenoid valve 45CR is deenergized.
3. Clear all personnel out of the accessory and turbine compartments. Make sure all ventilating fans
are on during and after testing to remove the discharged CO
4. Cycle each pneumatic timer by operating a push button station or by operating the manual release
to determine that the timing is as required. Cycling should be done with the discharge manifold
under pressure, but with the tank shutoff valve closed so as to provide only a "puff" discharge
vapor.
5. Cycling of the timers will also serve to prove operation of the pressure switches and in turn the
performance of electrical shutdown and annunciation.
Note: The timing cycle can be aborted by closing the isolation valve and re-
setting the pressure switch after the timer re-sets.
6. When the system starts to discharge, relay 45FTX should pick up to trip the turbine. The fire
alarm bell in the accessory compartment should also ring, and the fire flag on the annunciator
should drop.
7. After CO
of CO
, also inspect to see that all ventilation dampers have operated properly.
2
At the completion of testing, refill the storage unit to capacity, as required. Bubble test the packing glands
of the tank shutoff valve and vapor supply valve for bubble tightness. Leave both locked in the full-open
position. The system is now ready for operation.
-operated latches.
2
discharge has stopped, re-set pressure switch 45CP. When the compartments are clear
2
Inspection and Maintenance Procedures
system is ready for operation. These
2
into the system as a final check on
2
from the area.
2
IMP–17