GE MS-6001B Maintenance Instructions Manual page 73

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Inspection and Maintenance — GEK 107048
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont'd)
TRANSITION PIECE ARRANGEMENT COMBUSTION (ML0717)
1.
Seal, Aft-Side, Combustion Transition Piece
**2.
Bolt, Shoulder (Transition Piece Aft Mounting Bracket)
**3.
Lockplate (Transition Piece Aft Mounting Bracket)
**4.
Bolt, Shoulder (Transition Piece Forward Mounting Bracket)
**5.
Lockplate (Transition Piece Forward Mounting Bracket)
**6.
Lockplate (Transition Piece Forward Mounting Bracket)
**7.
Lockplate (Transition Piece Seal Retainer)
**8.
Bolt, Shoulder (Transition Piece Seal Retainer)
LINER ASSEMBLY COMBUSTION (ML0703)
1.
Cap and Liner Assembly
TRANSITION PIECE ASSEMBLY, COMBUSTION (ML0702)
1.
Transition Piece Assembly
CASING, COMBUSTION ARRANGEMENT (ML0719, 0708, 0701)
1.
Outer Combustion Case, Cover Bolts
SPARK PLUG ASSEMBLY (ML1214)
1.
Igniter Assembly
2.
Base Assembly (Spark Plug)
**3.
Gasket
ULTRAVIOLET FLAME DETECTOR ASSEMBLY (ML1121)
1.
Ultraviolet Flame Detector
Standard Practices
Recommended
Quantity
10
20
20
20
10
10
10
10
10
10
*48*
1
1
2
2
SP-47

Advertisement

Table of Contents
loading

Table of Contents