5.3.2 Confirming Operation; [Image 5-18] Step 3 Network Configuration - Wiznet IGM7100 User Manual

Table of Contents

Advertisement

G
G
uŒžG
uŒžG
uŒžG
uŒžG
šŒ™ˆ“G
šŒ™ˆ“G
šŒ™ˆ“G
šŒ™ˆ“G
‹ŒŠŒ
‹ŒŠŒ
‹ŒŠŒ
‹ŒŠŒ
ž›Gpnt^XWWt–‹œ“Œ
ž›Gpnt^XWWt–‹œ“ŒG G
ž›Gpnt^XWWt–‹œ“Œ
ž›Gpnt^XWWt–‹œ“Œ

[Image 5-18] Step 3 Network Configuration

c G
Remove Board B from the serial device connection and
embed it on-board to the serial device as shown in [Image
5-18].
G
Connect computer to the hub.
G
Connect the new serial device with Board B to the hub.

5.3.2 Confirming Operation

The process is identical to Section 5.2.3 with the exception
that IGM7100 test board is installed onto the serial device
(refer to Section 5.2.2).
describe a new product integrating the serial device and
IGM7100 Module, and the executing method is identical to
Section 5.2.2.
oˆ™‹ž™Œ‹Gp•›Œ™•Œ›Gj–••ŒŠ›› G~¡ˆ™‹GO~p•Œ›SGp•ŠUPG
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
l›Œ™•Œ›G G G G
l›Œ™•Œ›
l›Œ™•Œ›
l›Œ™•Œ›
G G G G
The purpose of this step is to
t–‹Œ‹G ˆ——“Šˆ›–•G
t–‹Œ‹G ˆ——“Šˆ›–•
t–‹Œ‹G ˆ——“Šˆ›–•G
t–‹Œ‹G ˆ——“Šˆ›–•
—™–Ž™ˆ”G G G G
—™–Ž™ˆ”
—™–Ž™ˆ”
—™–Ž™ˆ”
G
l›Œ™•Œ›G G G G
l›Œ™•Œ›
l›Œ™•Œ›
l›Œ™•Œ›
wjG G G G
wj
wj
wj
\ZG

Advertisement

Table of Contents
loading

Table of Contents