Download Print this page

Xtracycle EdgeRunner Swoop Assembly Manual page 13

Advertisement

Bolt Down the Deck
16
Note: If you are having a hard time
aligning the holes in the deck to the
holes in the rack bosses, loosen the
WeddingRings so that you can move
the V-Racks slightly.
If you've already installed your Hooptie handrails
(optional) secure the deck by tightening the four bolts
already in the deck and installing the four long bolts
and nylock nuts provided into the empty bosses on
the V-Rack - two in the front and two in the rear.
Note: The larger thicker washer goes between the
deck and the V-Rack.

Advertisement

loading

This manual is also suitable for:

Edgerunner classic