Download Print this page

Advertisement

Quick Links

Swoop assembly Manual 2021

Advertisement

loading

Summary of Contents for Xtracycle Swoop 2021

  • Page 1 Swoop assembly Manual 2021...
  • Page 2: Tools Needed

    Assembling the xtracycle swoop Tools needed 01 - Open the bike box 3 mm Allen wrench Look over the box for signs of shipping damage. If damage 4 mm Allen wrench is present, please take pictures in case a shipping damage 5 mm Allen wrench report needs to be filed.
  • Page 3 Open the box. Inspect the contents and look again for any signs of shipping damage. Remove the small parts box, the KickBack 3 and the seat Cut the string attaching the rear of the bike to the end of the post and set these aside.
  • Page 4 Remove all of the packaging from the seat post and saddle. Remove the bike from the box and secure it in your bike With the bike still in the box, install the seat post into the stand. Once in the stand, loosen the FreeLoader Too bag and frame.
  • Page 5 Remove the front fender from the front wheel and retrieve Use the two black M5 bolts to secure fender struts to the the M6 x 50mm bolt, M6 nyloc nut, two M6 washers, and the front fork. stabilizer spring L-bracket from the small parts box. Install the front fender top mounting tap to the top of the front fork with the appropriate hardware in this order: M6 x 50mm bolt, M6 washer, [thru fork], fender attachment tab, stabilizer...
  • Page 6 Install the front wheel onto the fork. Make sure the rotor rests Install the front light to the fender front tab with an M6 x in between the brake pads. Reinstall the front axle using the 15mm bolt. Attach front light wires from frame to front light M6 Allen wrench.
  • Page 7 21 - Install the KickBack 3 Clean up the wires going into the frame with wire wrap. Grab the KickBack 3 and needed hardware to install the KickBack 3. The KickBack 3 mounting plate needs to be slid into these Start to thread one M5 bolt up from the bottom of the brackets and then the mounting plate bracket bolt can be KickBack mounting plate.
  • Page 8 With the KickBack legs folded up, place both Xtracycle Moving the legs as necessary to allow for access to the U-bolts over the Xtracycle’s front bridge and through the bolts, lightly snug all four nuts with a 10mm socket wrench.
  • Page 9 29 - Adjust the stem and handlebars Using the 10 mm socket wrench, fully tighten all four U-bolt You will now be adjusting the front stem and handlebars. nuts. The installation of the KickBack is now complete. Loosen the stem bolts and rotate the stem to a forward facing position.
  • Page 10 33 - Connect the cycling computer Rotate the handlebar grips into a comfortable upright Place the wire hanging off the front of the handlebars into position and secure into place using a 3 mm Allen wrench. the Shimano Cable Tool TL-EW300 which is located in the small parts box.
  • Page 11 36 - Install the pedals 37 - Install the U-Tubes Identify the left (drive side) right (non-drive side) pedals by Before installing the U-Tubes, please take note that the the markings on the threaded axle. The drive side (the side rear insertion end on each U-Tube is slightly longer than the that the chain is on) is clockwise threaded, the non-drive insertion end on the front end of the U-Tube.
  • Page 12 Check to see if the U-tubes will fit into the frame. If they If your U-tubes do not seem to easily slide into the frame, you comfortably slide into the holes, skip to step 42. will need to loosen the tailpiece on the back end of the bike in order to acquire additional tolerance.
  • Page 13: Complete Assembly

    FreeLoader Too bags to the bike frame. Your Swoop assembly is now complete. Looking to install additional accessories? Please refer to the following page on the Xtracycle wesbite for links to additional installation manuals: https://www.xtracycle.com/product-manuals/...

This manual is also suitable for:

Eswoop 2021