Field System Setup
• • • • • •
This chapter describes the field setup of your new receiver, so it is ready for use as a Base, network, RTK Rover, or static data
collector.
Setting Up the Base Receiver
1. Install a heavy‐duty tripod (p/n: 22‐050501‐01)
over a known point. You do not need a universal
tribrach and tribrach adapter when working with
this tripod.
2. Attach the antenna to the modem antenna
connector.
3. Level the tripod and tighten the screws.
4. Attach any other accessories as needed, such as a
back‐up power supply.
5. Measure the height of the receiver from the
ground using the tape measure. See "Measuring
Antenna Height" on page 57.
6. View the LED display panel for the receiver's
current status. See also "Display Panel Operations"
on page 19.
Field System Setup
GR-5 Receiver
Heavy Duty Tripod
P/N: 7010‐1004
55