4. Locate the slot in the chassis where you plan to install the server module.
A filler panel should remain in this slot until just before you are ready to insert the
server module. All slots should remain filled with server modules or filler panels
to ensure correct air flow, heat, and electromagnetic interference conditions in the
modular system.
5. Remove the filler panel from the selected chassis slot.
Pull down the ejector arm of the filler panel, then pull the panel straight out of the
chassis.
Caution – Be ready to insert the server module within 60 seconds of removing the
filler panel.
6. Use both hands to position the server module vertically with the ejector arms on
the right (panel 1).
7. Push the server module into the empty slot until the module extends about 1.5
cm (0.5 inch) from the chassis front (panel 2).
8. Pinch the ejector levers to open them (panel 2).
9. Push the server module into the chassis and close the ejector levers (panel 2 and
3).
24
SPARC T4-1B Server Module Installation Guide • May 2012
Need help?
Do you have a question about the SPARC T4-1B and is the answer not in the manual?
Questions and answers