5.7.1.

Electrical Preparation

To avoid electrical shock and/or a fire hazard, make sure electrical work is
properly installed. Only qualified electricians should perform electrical
work.
Before installation disconnect the power supply to the work area by unplugging the unit, "tripping"
the circuit breaker or removing the fuse.
The installer has the responsibility of ensuring that the dishwasher electrical installation is in
compliance with all national and local electrical codes and ordinances. The dishwasher is
designed for an electrical supply of 120 V, 60 Hz, AC, connected to a dishwasher-dedicated,
properly grounded electrical circuit with a fuse or breaker rated for 15 amperes.
To the right side position the cable extending
approximately 5½" (140mm) (Figure B).
Electrical supply cords must be a minimum #14AWG copper wire.
Position the cable extending approximately 30" (760mm) from the
enclosure's back (Figure A).
Remove 2 15/16" - 315/16" (75mm-100mm)
19
BUILT- UNDER DISHWASHER
of the cable's outer casing, and then
remove 3/8" - 1/2" (9-13mm) of insulation
from each wire. (Figure C)