6
Checking Before Installation
Checking the Installation Site
The space required for installation and maintenance work is shown below.
Staple Finisher-J1
500mm
or more
Booklet Finisher-J1
500mm
or more
6
Installation > Checking Before Installation > Installing the Accessories
100mm or more
100mm or more
F-6-3
Installation > Checking Before Installation > Installing the Accessories
Installing the Accessories
If you are installing accessories at the same time as you are installing this product, install the
host machine first and then the accessories in the following sequence:
1) Installation of the buffer pass unit [1] (See its Installation Procedure.)
2) Staple finisher [2], Booklet finisher [2] (See the steps up to "Making Preparations on the
Host Machine" herein.)
3) Puncher unit [3] (See its Installation Procedure.)
4) Connection to the host machine (See "Connecting to the Host Machine" herein or the
steps in "Connecting to the Host Machine" and thereafter in the External Hole Puncher
Installation Procedure.)
[2]
[2]
6-3
[1]
[3]
F-6-4
6-3