M.2 Ssd Enablement Option - HP ProLiant DL60 Gen9 User Manual

Hide thumbs Also See for ProLiant DL60 Gen9:
Table of Contents

Advertisement

Slot 3
o
Align the PCI riser board with the corresponding connector on the system board, and then press
8.
down the riser cage.
Tighten the two screws to secure the cage.
9.
IMPORTANT: The server does not power up if the PCI riser cage is not seated properly.
Install the access panel (on page 19).
10.
Install the server into the rack.
11.
Power up the server (on page 15).
12.

M.2 SSD enablement option

To install the component:
Power down the server (on page 15).
1.
Hardware options installation 68

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents