Getting Started - MB Connect Line mbNET.mini User Manual

Compact industrial router for din-rail mounting
Hide thumbs Also See for mbNET.mini:
Table of Contents

Advertisement

9

Getting started

The device is intended to be installed in switch cabinets and designed to be mounted on top-hat rails (ac-
cording to DIN EN 50 022).
Insert the device into the DIN rail.
To do this, position the upper guide of the bracket on
the rail on the back of the device and then press the
device downwards against the rail until fully inserted.
Depending on the device, connect an antenna, and insert a SIM card.
The SIM card used must be Internet- / VPN-enabled. If you have any questions, contact your cell phone
operator.
Connect the mbNET.mini to the power supply
Before connecting the device to a network or PC, first ensure that it is properly connected to a power supply,
otherwise it may cause damage to other equipment. You should therefore follow the instructions given below.
Connect equipotential bonding to the functional earth
(FE).
Connect the mbNET.mini to a power supply (10 – 30
VDC).
After turning on the power supply, the LED Pwr lights up.
As soon as the system has been checked and started (duration approx. 25 sec), the Rdy LED flashes for the
dura-tion of the starting up process (approx. 90 sec).
The mbNET.mini is now ready for operation.
T 0
For further support on the mbNET.mini, visit our website on www.mbconnectline.com.
ADVI C E
ADVI C E
T + 25 sec
Make sure the polarity is correct!
T + 90 sec
Getting started | Page 15 of 90

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents