Mercury 75 Service Manual page 448

Table of Contents

Advertisement

7. Allow unit to stand five minutes then proceed to
cycle unit 2-3 more times using short strokes. No
air bubbles should appear from accumulator port
at this time.
8. With oil level well above accumulator port, slowly
pull rod to full up position.
9. Install accumulator making sure air bubbles do
not enter system.
10. Tighten accumulator snugly at this time.
5E-34 - MID-SECTION
11. With cam lever remaining open (facing down),
remove tilt assembly from oil and secure in soft
jawed vise. Torque accumulator to 35 lb. ft. (47.5
N·m).
50432
50432
50433
90-830234R3 DECEMBER 1997

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 marathon75 sea pro11512565/80 jet90 ... Show all

Table of Contents