Mercury 75 Service Manual page 106

Table of Contents

Advertisement

a - Brush Retainer Tool
b - Bushing (DO NOT Over Lubricate)
9. Install armature into starter frame and align
match marks. Install commutator end cap onto
starter frame and align match marks. Remove
brush retainer tool. Install through bolts and
torque to 70 lb. in. (7.9 N·m).
c
a
a - Alignment Marks
b - Alignment Marks
c - Bolts [Torque to 70 lb. in. (7.9 N·m)]
2B-24 - ELECTRICAL
a
b
11661
c
b
11646
INSTALLATION
1. Install 2 rubber collars and 2 rubber bumpers.
a
b
a - Rubber Collars
b - Rubber Bumpers
2. Install components as shown.
3. Connect battery leads to battery.
a
b
h
a - Clamp, upper
b - Bolts [Torque to 14.5 lb. ft. (19.7 N·m)]
c - Bolt and Lockwasher
d - BLACK Cable
e - Sta-strap
f - Starter
g - YELLOW Cable [Torque nut to 60 lb. in. (6.8 N·m)]
h - Clamp, lower
i - BLACK Negative (-) Battery Cable
j - J-Clip
k - Fuse Holder
90-830234R3 DECEMBER 1997
a
11645
b
d
c
e
f
g
b
j
i
k
54159

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 marathon75 sea pro11512565/80 jet90 ... Show all

Table of Contents