Danfoss VLT FC 103 Operating Instructions Manual page 57

Refrigeration drive 75-630 kw
Hide thumbs Also See for VLT FC 103:
Table of Contents

Advertisement

Start-up and Functional Tes...
Inspect for
Description
Cable routing
Use separate metallic conduits for each of the following:
Control wiring
Check for broken or damaged wires and loose connections.
Check that control wiring is isolated from power and motor wiring for noise immunity.
Check the voltage source of the signals, if necessary.
Use shielded or twisted pair cable. Ensure that the shield is terminated correctly.
Cooling clearance
Measure that top and bottom clearance is adequate to ensure proper air flow for cooling.
EMC considerations
Check for proper installation regarding electromagnetic compatibility.
Environmental consider-
See equipment label for the maximum ambient operating temperature limits.
ations
Humidity levels must be 5–95%, non-condensing.
Fusing and circuit
Check for proper fusing or circuit breakers.
breakers
Check that all fuses are inserted firmly and in operational condition and that all circuit breakers are
in the open position.
Grounding
The unit requires a ground wire from its chassis to the building ground.
Check for good ground connections that are tight and free of oxidation.
Grounding to conduit or mounting the back panel to a metal surface is not sufficient.
Input and output power
Check for loose connections.
wiring
Check that motor and mains are in separate conduit or separated screened cables.
Panel interior
Inspect that the unit interior is free of debris and corrosion.
Switches
Ensure that all switch and disconnect settings are in the proper positions.
Vibration
Check that the unit is mounted solidly or that shock mounts are used, as necessary.
Check for an unusual amount of vibration.
Table 4.1 Start-up Checklist
MG16J202
Operating Instructions
-
Input power
-
Motor wiring
-
Control wiring
Danfoss A/S © Rev. 05/2014 All rights reserved.
4
4
55

Advertisement

Table of Contents
loading

Table of Contents