EdilKamin SIDE 50x50 Installation - Use - Maintenance page 21

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 16
Smoke channel
The smoke channel is the duct which
The smoke channel must be made of
rigid pipe in steel or ceramic material;
ment are not allowed.
tions must be avoided.
Any difference in section is allowed
Angles of more than 45° are not al-
lowed.
must be sealed with heatproof mastic.
In addition to the above, it is also nec-
essary to take into consideration the
indications of paragraph 4.2 and sub-
paragraphs of standard UNI 10683
"connecting to the fume evacuation
system".
Flue and chimney
tually reaches the roof of the building.
- must be of temperature class T450 or
- must have the capacity to stand a
temperature of at least 450°C as regards
mechanical resistance, insulation and air
tightness
- must have suitable insulation to avoid
the formation of condensation - with
constant section, practically vertical
position and without angles of more than
45%
INSTALLATION
- must have preferably circular internal
sections; in the case of rectangular sec-
-
- must have an internal section with a
-
the technical information sheet
-
stove).
not particularly large, it is advisable to
a suitable diameter and suitable insula-
tion.
metres, it is advisable for the installer
-
Basic features of the chimney:
- position in full wind, above the roof
Installation of the body
a prefabricated casing, Edilkamin can
only if it knows what type of casing
will be used. The position will differ
according to the chosen model (consult
the assembly instructions contained in
every casing package). During installa-
tion always check vertical and horizontal
positions.
regulation mechanism as described in
a stainless steel pipe of the diameter in-
dicated in the technical data table (page
chapter
- kits are available for channelling hot
air as described in detail on page 22.
- on completion of installation, allow the
movement of the door by unscrewing the
red counterweight lock screw on the side.
-
- check that all moving parts work cor-
rectly.
Before installing the lining, the cor-
rect functioning of the connections, the
controls and all moving parts must be
checked.
- 21
The check must be carried out with the
lining in order to be able to take any ac-
tion necessary.
ried out, such as:
- construction of the mantel
- installation of pilasters, painting, etc.
which must be carried out after success-
ful testing.
Edilkamin will not be liable for any
demolition or reconstruction costs even
The parts of the casing in marble, stone
from the prefabricated product to avoid
below the edge of the hearth:
- a suitable gap must be left for the recir-
culation of the environmental air
with forced ventilation.
The parts in wood must be protected by
at a suitable distance of at least 1 cm to
accumulation of heat. The mantel must
or plaster slabs; during construction the
as indicated above. The area inside the
which enters from below (space between
by convection from the upper grill,
allowing for the recovery of heat and
In addition to the above, it is also
necessary to take into consideration
paragraphs 4.4 and 4.7 of the stand-
casing and safety recommendations"
Fig. 1
-
-
-
grille
hot air outlet from the
mantel
Door slider
guide
Wooden
beam
Front part
Air inlet in the
mantel
sliding door

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Side 2Side 3

Table of Contents