Jeep cherokee 1989 Owner's Manual page 333

Table of Contents

Advertisement

Coolant
level check, 1-8
general information, 3-2
reservoir, removal and installation, 3-6
temperature sending unit, check and replacement, 3-5
Cooling system
check, 1-14
general information, 3-2
servicing, 1-31
Cooling, heating and air conditioning systems, 3-1 through 3-13
Crankshaft
front oil seal, replacement
Four-cylinder engine, 2A-10
lnline six-cylinder engine, 2C-6
V6 engine, 2B-6
inspection, 2D-19
installation and main bearing oil clearance check, 20-24
removal, 2D-13
Cruise control system, description and check, 12-8
Cylinder compression check, 2D-3
Cylinder head
cleaning and inspection, 2D-8
disassembly, 2D-8
reassembly, 2D-11
removal and installation
Four-cylinder engine, 2A-7
lnline six-cylinder engine, 2C-5
V6 engine, 2B-5
Cylinder honing, 2D-17
Dashboard panels, removal and installation, 11-9
Dent repair
major damage, 1 1-3
minor damage, 11 -2
Diagnosis, 0-22
Differential
general information, 8-8
lubricant change, 1-28
lubricant level check, 1-19
Disc (brake), inspection, removal and installation, 9-7
Disc brake caliper, removal, overhaul and installation, 9-5
Distributor cap and rotor check and replacement, 1-37
Distributor, removal and installation, 5-6
Door
latch, lock cylinder and handle, removal and installation, 11-13
removal, installation and adjustment, 11 -8
trim panel, removal and installation, 11-7
window glass, removal and installation, 11-12
Drivebelt check, adjustment and replacement, 1-22
Driveline inspection, 8-9
Driveshafts
differentials and axles, general information, 8-8
removal and installation, 8-9
Drum brake shoes, replacement, 9-8
Electrical
circuit diagrams, general information, 12-8
general information, 12-0
troubleshooting, general information, 12-1
Emergency battery jump starting, 0-17
Emission maintenance timer, replacement, 1-36
Emissions and engine control systems, 6-1 through 6-22
Engine
block
The Motor Manual Guy
Index
cleaning, 2D-14
inspection, 2D-15
camshaft and bearings, removal, inspection and installation
Four-cylinder engine, 2A-13
V6 engine, 2B-9
compression check, 2D-3
Crankshaft
inspection, 2D-19
installation and main bearing oil clearance check, 2D-24
removal, 2D-13
Cylinder head
cleaning and inspection, 2D-8
disassembly, 2D-8
reassembly, 2D-11
removal and installation
Cylinder honing, 2D-17
Initial start-up and break-in after overhaul, 2D-28
Main and connecting rod bearings, inspection, 2D-19
mounts, check and replacement
Four-cylinder engine, 2A-17
V6 engine, 2B-13
oil change, 1-15
overhaul
disassembly sequence, 20-7
general information, 2D-2
reassembly sequence, 2D-23
piston rings
inspection, 2D-17
installation and rod bearing oil clearance check, 2D-27
removal, 2D-12
rear main oil seal installation, 2D-26
rear main oil seal, replacement
Four-cylinder engine, 2A-16
lnline six-cylinder engine, 2C-11
V6 engine, 28-1 1
rebuilding alternatives, 2D-6
removal and installatio.n, 2D-4
removal, methods and precautions, 2D-4
repair operations possible with the engine in the vehicle
Four-cylinder engine, 2A-2
lnline six-cylinder engine, 2C-1
V6 engine, 2B-1
Engine cooling fan and clutch, check and replacement, 3-4
Engine electrical systems, 5-1 through 5-14
Engine identification number, 0-7
Engine mounts, check and replacement
Four-cylinder engine, 2A-17
lnline six-cylinder engine, 2C-11
V6 engine, 28-13
Evaporative emissions control system check, 1-32
Exhaust system servicing, general information, 4-20
Exhaust Gas Recirculation (EGR) system, 6-14
Exhaust Gas Recirculation (EGR) system check, 1-32
Exhaust manifold, removal and installation
Four-cylinder engine, 2A-7
lnline six-cylinder engine, 2C-4
V6 engine, 2B-4
Exhaust system check, 1-19
Fan, engine cooling, check and replacement, 3-4
Fault finding, 0-22
Filter, fuel, replacement, 1-25
Four-cylinder engine, 2A-7
lnline six-cylinder engine, 2C-5
V6 engine, 2B-5
-
installation, 2D-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comanche 1989

Table of Contents