Material Change: Changing Powder In A Build Module - 3D Systems ProX DMP320 User Manual

Table of Contents

Advertisement

8 .
Remove overflows and clean the inside of the overflows using
paper towels with IPA .
9 .
Unfasten the 4 bolts on top of the overflow and then remove the
lid to clean out the inside .
10 . Replace bolts when finished.
11 . When all areas have been thoroughly cleaned, install clean
module and fill with new powder.
MATERIAL CHANGE BY CHANGING BUILD MODULES
This procedure is to be followed if you have a second build module containing a different material .
1 .
Remove Build Module 1 from the build chamber .
2 .
Clean the interior of the build chamber as described in the previous procedure .
3 .
Install Build Module 2 .
7 .
Home the axis of Build Module 2 .
8 .
Begin your next build .
9 .
Place a cover over Build Module 1 to protect the material from dust and any other contaminents .
10 . If Build Module 1 is to remain unused for an extended period of time, (over one week), remove all of the material from Build Module
1 as described the the previous procedure. Store the material as described in the section, "Material Safety", in this document.
3D SYSTEMS, INC.
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents