Installation in a
Hard Ceiling
To install the SF 26CT in a hard ceiling (having no ceiling tiles), with the ceiling structure in
place, follow the steps in this section.
Topics in this section include:
•
•
•
Preparing the Installation Location
1.
2.
3.
4.
5.
Configuring the Speaker
Follow the steps in
Preparing the Installation Location
Configuring the Speaker
Mounting the Speaker
Power down all attached devices before proceeding.
Cut a hole for the speaker. Use the provided cutout template to outline the hole to be
cut in the ceiling as described below.
a.
Mark the location on the ceiling where the center of the speaker will be placed.
b.
Position the center hole of the cutout template directly over the center mark.
c.
Trace a circle around the cutout template.
d.
Cut out the traced circle.
Fold one C-ring assembly in half and insert it through the hole in the ceiling.
Unfold the C-ring and center it over the hole with the flat side down.
Figure 22.
Installing the C-ring
Route the speaker wires through the ceiling hole.
Configuring the Speaker
on page 5.
SF 26CT User Guide • Installation in a Hard Ceiling
18
Need help?
Do you have a question about the SF 26CT and is the answer not in the manual?
Questions and answers