2.1.5
Fabricating JIS cables
Fabricate JIS cables as shown below to connect them to the WAGO connectors on
the PCU-3000 (See following page for WAGO connection).
After fabricating the cable, attach the WAGO connector and EMI ferrite core (sup-
plied). For how to attach the WAGO connecor and EMI ferrite core, see the next page.
Fabrication of TTYCS series
Armor
Vinyl tape (Width: 20)
Fabrication of TTYCSLA series
Armor
Vinyl tape (Width: 20)
Clamp here with cable clamp.
Sheath
Shield
30
After exposing cores, wind shield
around the armor.
Clamp here with cable clamp.
*
100
5
Sheath
Drain wire
80
Pass a heat shrink tube (local supply) onto the
drain wire, then attach the crimp-on lug (supplied
with the PCU-3000) to it.
For flush mounted
installations, connect the
drain wire to this terminal.
C4
C2
C3
C1
IEC61162-1/2
USB3
USB1
USB4
USB2
LAN2
LAN1
NOTE: All dimension in millimeters
200
6
6
150
Crimp-on lug (supplied)
2. WIRING
2-7