Setting Up the Chassis
3. Route SCSI/SATA data cables through the chassis openings located near the bottom of the
drive cage. Connect data cables to the respective fixed drive and to the appropriate
connector on the server board.
TP00552
Install 3.5-inch Floppy Drive
1. Press pair of slides inward (letter "A") to release and pull slide/filler panel assembly out of
upper device bay. Remove EMI panel from bracket (letter "B").
Figure 15. Removing Slide/Filler Panel Assembly from Upper Device Bay
16
To 4-Drive
Cage
Upper
Bay Cables
4/6-Drive
Bay Cables
Figure 14. Routing SCSI/SATA Data Cables
A
A
To 6-Drive
Cage
B
TP00535
Intel® Server Chassis SC5300 User Guide