H3C S7508E-X Installation Manual page 110

Hide thumbs Also See for S7508E-X:
Table of Contents

Advertisement

Index
A C E F G H I L M N O P Q R S T V W
A
AC power
cables,75
Accessing the switch for the first
Air
filters,69
Attaching an ESD wrist
Attaching slide rails and cage nuts to the
C
Cable management
requirements,93
Chassis
views,55
Configuring basic IRF
Configuring the
switch,37
Confirming installation
Connecting the physical IRF
Connecting the power
Connecting the switch to the
Console
cable,84
Correct use of
labels,92
E
Environmental
specifications,62
Ethernet twisted pair
cable,84
Examining the installation
F
Fan
failure,45
Fan tray
LEDs,82
Fan
trays,69
G
General cabling
requirements,92
Grounding the
switch,17
H
Heat
dissipation,61
I
Installing a power
module,21
Installing a transceiver module
Installing an air filter
(optional),14
Installing IRF member
time,32
strap,19
rack,7
settings,29
preparations,7
ports,30
cable,23
network,40
site,2
(optional),24
switches,29
Installing mounting brackets and cable management
brackets,12
Installing MPUs/LPUs/switching fabric
Interface
failure,46
IRF fabric setup
flowchart,27
L
LPU and switching fabric module
LPU
LEDs,80
LPUs,63
M
Module power consumption and system power
consumption,59
Mounting the switch on a workbench or on the
Mounting the switch to the
MPU
failure,45
MPU
LEDs,78
MPUs,63
N
Noise,62
O
Optical
fiber,88
P
Planning IRF fabric
Power module
LEDs,82
Power
modules,69
Power supply system
Q
QSFP+
cable,90
QSFP+ to SFP+
cable,91
R
Removing cables from the
Repackaging the switch
Repackaging the switch
Replacing a
card,49
Replacing a fan
tray,50
102
modules,20
failure,45
rack,14
setup,28
failure,44
switch,96
accessories,97
chassis,98
floor,15

Advertisement

Table of Contents
loading

Table of Contents