A3. Scope of delivery

Hardware:
DIVUS TOUCHZONE
Fixing set to be used with wall mount kit
Retention screw
Aluminum front cover
Recovery-microSD
Software:
Pre-Installed, fully functional operating system
Documentation:
Technical manual
Warrantee conditions
Note: Please refer to chapter C of this manual which contains important information about the
installation of the OS.
B. C
OMMISSIONING

B1. Grounding

The following must be heeded to ensure that all electrical interference is safely absorbed:
Connect the metallic wall mount kit with a central grounding point using the shortest possible distance.
Make sure that the connection between the unit and the grounding point has the lowest possible impedance.
All data cables connected to the unit must be shielded.
The shields must be grounded at both ends. A low-impedance connection must be established between the
linked units. High compensation currents over the cable shields caused by potential differences must be
excluded.
Use a green-yellow cable with a minimum cross section of 2,5mm² for ground connection.

B2. Commissioning

Power supply of TOUCHZONE is granted or through "Power over Ethernet" or through DC input on DCin
plug. If using PoE ensure that your switch, injector or power adapter is fully PoE compliant.
Power consumption of the device is defined in the technical documents.
More technical details of the power supply can be found in section D2.
Caution!
Pull out the power plug before opening the unit. Check all cable connections before
commissioning the system. Make sure that all voltages and signals meet the specifications.