Step 8: Install The Cable Management Arm - IBM pseries 630 6C4 Installation Manual

Hide thumbs Also See for pseries 630 6C4:
Table of Contents

Advertisement

Step 8: Install the Cable Management Arm

To install the Model 6C4 cable management arm, do the following:
1. Attach the cable carrier support bracket to the back of the chassis with two screws.
2. Place the two captive snap buttons, located on the cable management arm, into the
unlocked (pulled out) position.
3. Align and insert the two captive snap buttons into the holes located on the cable
carrier support bracket. Pushing in on the head of the snap buttons locks them into
position.
4. Open the cable management arm so that the hinged mounting plate lies flat against
the flange-mounting bracket.
5. Align the holes, located on the cable management arm mounting plate, with the
threaded holes on the rack-flange mounting bracket. Secure the bracket with two
screws.
Note: To avoid any binding of the cable management arm, ensure that the cable
Eserver pSeries 630 Model 6C4 and Model 6E4 Installation Guide
24
1 Model 6C4
2 Cable Carrier Support Bracket
3 Captive Snap Button (Qty. 2)
management arm is level.
4 Rack Flange Mounting Bracket
5 Cable Management Arm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pseries 630 6e4

Table of Contents