Fronius IG 15 Operating Instructions Manual page 44

Grid-connected inverters for photovoltaic systems
Table of Contents

Advertisement

(C)
(D)
(A)
(B)
If a successful data link has been
(B)
set up then „OK
- Press key (B) to call up the Sig-
nal Card test
(D)
- Start the Signal Card test by
pressing the „Enter" key (D)
Signal Card active
- The Signal Card's acoustic signal sounds for confirmation.
Important! Check the signal lines if the signal fails to sound.
(D)
" is displayed.
COM
(D)
(C)
36
(A)
(B)
„Error" is displayed if DatCom is
not installed or the data link is
not functioning correctly.
Signal Card not installed
(C)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ig 30Ig 40Ig 60Ig 60 hvIg 20

Table of Contents