Jeep Cherokee 2000 Service Manual page 339

Hide thumbs Also See for Cherokee 2000:
Table of Contents

Advertisement

XJ
REMOVAL AND INSTALLATION (Continued)
(2) Reconnect the starter motor electrical. Torque
(B+) nut to 27 N·m (20 ft. lbs.).
CAUTION: Heatshield is very sharp. Wear gloves to
prevent injury.
(3) Install the starter heat shield.
(4) Install the starter motor support bracket.
Torque bolt to 47 N·m (35 ft. lbs.). Torque nuts to 10
N·m (90 in. lbs.).
(5) Install the engine mount and engine mount
bracket in the vehicle.
(6) Install the engine mount throughbolt and nut
leaving them loose at this time.
(7) Install, but do not torque the engine mount
and track bar support bracket bolts
(8) Install the (4) engine mount bracket to engine
block bolts. Torque bolts to 61 N·m (45 ft. lbs.).
(9) Remove the jack stand.
(10) Install and torque the upper engine mount sill
plate nuts to 41 N·m (30 ft. lbs.).
(11) Torque the lower engine mount retaining bolts
to 54 N·m (40 ft. lbs.).
(12) Torque the larger track bar support bracket
bolts to 125 N·m (92 ft. lbs.).
(13) Torque the engine mount throughbolt nut to
65 N·m (48 ft. lbs.).
(14) Install the oil return line on the engine block
nipple.
(15) Install steering shaft pinch bolt. Torque to 49
N·m (36 ft. lbs.).
(16) Lower the vehicle from the hoist.
(17) Connect the negative battery cable.
STARTER RELAY
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the cover from the Power Distribution
Center (PDC).
(3) Refer to the label on the PDC for starter relay
identification and location.
(4) Unplug the starter relay from the PDC.
(5) Install the starter relay by aligning the relay
terminals with the cavities in the PDC and pushing
the relay firmly into place.
(6) Install the PDC cover.
(7) Connect the battery negative cable.
(8) Test the relay operation.
STARTING SYSTEMS
8B - 3

Advertisement

Table of Contents
loading

Table of Contents