9. CD mechanism
Fig. 6
10. Top plate
Fig. 7
Fig. 8
- Carry out points 1 and 3 as well as points 6 to 8.
- Remove two screws from the cover over the CD mechanism.
- Lift the cover on the left-hand side and push it towards the right.
- Remove the two screws (C) for the cover of the CD PCB. Remove the cover by
pulling it towards the left.
- Remove two screws for PCB41, CD.
- Lift up PCB41 a little and remove P99.
- Remove one screw for the bracket on the CD mechanism.
- Remove the four screws (D) that hold the CD mechanism.
- Lift up the CD mechanism a little and loosen the fl ex cable. Watch out for the fl ex
cable under the CD mechanism; the cable runs under the arm for the tension
springs.
C
P42
P46
P99
C
P45
- Carry out the points 1 to 8.
- Remove 35P53, power supply for sledge motor.
- Remove two screws (E) for the clamper holder, and remove the holder, Fig. 8.
- Remove the six plugs with a thin hook or a similar object.
- Remove the six screws in the bottom (F), and loosen the two screws (G) (approx.
six turns), Fig. 7.
- PLACE THE SLEDGE AT THE CENTRE.
- Loosen 26P96.
- The top can now be removed by pulling it towards the right while holding the
sledge. It will be released from the sledge automatically when it reaches the end.
- LIFT THE TOP PLATE AS LITTLE AS POSSIBLE AND VERY CAREFULLY IN ORDER TO
AVOID DAMAGING THE RIBBON CABLE AND STEEL BAND FOR THE SLEDGE.
- IT IS IMPORTANT TO HOLD ON TO THE SLEDGE. THE WIRE SYSTEM HAS BEEN
"TIGHTENED" SO THAT IT IS VERY TIGHT.
- Remove the plastic strip over the well containing the ribbon cables and the wires
by lifting up the strip.
- Place the sledge at the centre of the product.
- Instal the red holder on the bracket for wires/cable, Fig. 9.
- Loosen the spring on the right-hand side of the product, if necessary. The spring is
very tight. Be careful not to let the sledge turn around.
Dismantling and assembly, English
P47
6.7