HP 830 Installation Manual page 57

24-port poe+ unified wired-wlan switch
Hide thumbs Also See for 830:
Table of Contents

Advertisement

displaying switch information (on switching
engine), 35
displaying switch memory usage, 37
displaying switch operational statistics, 34
grounding the switch, 17
grounding the switch with AC power cord (PE wire),
19
grounding the switch with buried conductor, 18
grounding the switch with grounding strip, 18
installing HP 830 uplink module, 26, 27
installing lightning protector for network port, 20
installing switch, 9
installing switch on 19-inch rack, 1 1
installing switch on 19-inch rack with front
mounting bracket+rack shelf, 15
installing switch on 19-inch rack with front
mounting bracket+slide rails, 16
installing switch on 19-inch rack with front+rear
mounting brackets, 12
logging in to switching engine login using OAP,
33
mounting switch on workbench, 10
powering on switch, 29
rebooting the switch, 39
removing HP 830 uplink module, 26, 28
setting terminal parameters, 22
troubleshooting garbled terminal display, 31
troubleshooting no terminal display, 31
troubleshooting power supply failure, 31
troubleshooting software loading failure, 32
troubleshooting switch, 31
verifying installation, 29
rack
mounting brackets, 1 1
slide rails, 12
switch installation, 1 1
switch installation (front mounting bracket+rack
shelf), 15
switch installation (front mounting bracket+slide
rails), 16
switch installation (front+rear mounting brackets),
12
rebooting the switch, 39
removing
HP 830 uplink module, 26, 28
RPS
switch connection to RPS, 28
safety
AC power supply connection to power strip with
lightning protection, 21
caution and warning symbols, 3
electrical safety recommendations, 4
EMI prevention, 7
ESD prevention, 6
general recommendations, 3
installation site cleanness, 5
installation site dust concentration, 5
installation site gas saturation, 5
installation site humidity, 4
installation site temperature, 4, 6
laser safety recommendations, 4
lightning protection, 7
lightning protector for network port, 20
lightning protector installation precautions, 20
power requirements, 5
switch grounding, 17
switch grounding with AC power cord (PE wire),
19
switch grounding with buried conductor, 18
switch grounding with strip, 18
setting terminal parameters, 22
site
cleanness, 5
cooling requirements, 5
dust concentration, 5
examination, 4
gas saturation, 5
humidity, 4
power requirements, 5
temperature, 4, 6
slide rails, 12, 16
software
controller engine version information, 33
troubleshooting loading failure, 32
statistics
switch operational statistics, 34
switch
AC power cord connection, 28
AC power supply connection with lightning
protection, 21
built-in fan operational status, 37
console cable connection, 21
controller engine version information, 33
copper Ethernet port connection, 25
CPU usage display, 37
displaying hardware information, 33
electronic label data display (on controller engine),
36
electronic label data display (on switching engine),
36
Ethernet cable connection, 25
fiber Ethernet port connection, 25
53

Advertisement

Table of Contents
loading

Table of Contents