Testing Upgrading Results - Zte ZXA10 C300 Maintenance Manual

Gpon optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

5. Upgrade the patch file.
ZXAN#patch active SCXNV120P1T6_r0.pat
Check the patch details and the service running status.
6. Check the running versions.
ZXAN#show patch-running
7. Check the equipment running status.
8. Check the service running status.
– End of Steps –

6.4 Testing Upgrading Results

After the cards are upgraded, it is necessary to check whether the cards work normally
and the services are not affected.
Prerequisite
Before the operation, make sure that the upgrading of all the cards are complete.
Context
The test content includes the following:
l
Narrowband service
l
Broadband service
l
NM
management
l
ONU
Steps
1. Perform the following operations to test the narrowband service.
l
Test whether the H.248 interface status is compatible with that prior to upgrading.
l
Test whether the user's fax service is normal.
l
Test whether the voice service is normal.
l
Test whether the POTS machine, and the intelligent public telephone is normal.
2. Perform the following operations to test the broadband services.
l
Test whether the broadband dialling is normal.
l
Test whether the web page opening, the e-mail sending and receiving and the
download rate are normal.
l
Test whether the
3. Perform the following operations to test the NM functions.
l
Test whether the connection between the NMS server and NE is normal
l
Test whether the NMs can synchronize and configure the data properly.
4. Perform the following operations to test the ONU management.
l
Test whether all the ONUs are online and they can be successfully registered.
l
Test whether the ONU data can be delivered properly.
SJ-20130520164529-008|2013-06-30 (R1.0)
management
IPTV
service is normal.
6-9
Chapter 6 Version Upgrade Guides
ZTE Proprietary and Confidential