Network Information; Network Diagram; Ip Related Information; Configuration Tools - Patton electronics SmartNode 4400 Getting Started Manual

Ipchannel bank
Hide thumbs Also See for SmartNode 4400:
Table of Contents

Advertisement

SmartNode 4400 Series Getting Started Guide

Network information

When planning your installation there are certain critical considerations for the network connections. The fol-
lowing sections describe such considerations for several types of network interfaces.

Network diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and
telephony components.

IP related information

Before you can set up the basic IP connectivity for your SmartNode 4400 series you should have the following
information (see
table
6):
IP addresses used for Ethernet LAN and WAN ports
Subnet mask used for Ethernet LAN and WAN ports
IP addresses of central H.323 Gatekeeper (if used)
IP addresses of central PSTN Gateway for H.323 based calls
IP addresses of central TFTP Server used for configuration upload and download
Ethernet LAN (ETH 0/1)
Ethernet WAN (ETH 0/0)
H.323 Gatekeeper (if used)
IP address of central PSTN gateway (H.323-based calls)
IP address of central TFTP server for configuration upload/downloads

Configuration tools

You will need a PC (or equivalent) with a VT-100 emulation program (e.g. HyperTerminal) to configure the
software on your SmartNode 4400.

AC Power Mains

If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery
with large motors nearby, have a qualified professional test the power. Install a power conditioner if necessary.
Refer to
"Connecting power"
WARNING
Note
Planning the installation
Table 6. IP addresses/subnets for SN4400
Port/Device
on page 30.
The mains outlet that is utilized to power the equipment must be within
1 foot (3 meters) of the device and shall be easily accessible.
When setting up your SmartNode you must consider cable-length
limitations and potential electromagnetic interference (EMI) as
defined by the applicable local and international regulations. Ensure
that your site is properly prepared before beginning installation.
3 • Hardware installation
IP Address
IP Subnet
26

Advertisement

Table of Contents
loading

Table of Contents