Section 2. Getting Ready To Sew; Connecting The Power Supply; Controlling The Sewing Speed - ELNA eXplore 320 Instruction Manual

Hide thumbs Also See for eXplore 320:
Table of Contents

Advertisement

Operating Instructions:
The symbol "O" of a switch indicates the "off" position.
For an appliance with a polarized plug (one blade wider than the other):
To reduce the risk of electrical shock, this plug is intended to fit in a polarized outlet only one way.
If it does not fit fully in the outlet, reverse the plug. If it still does not fit, contact a qualified electrician to install the
proper outlet. Do not modify the plug in any way.
The foot controller Model YC-482J or TJC-150 is used with this sewing machine (USA market only).

SECTION 2. GETTING READY TO SEW

Connecting the Power Supply

Turn the power switch off.
1
Insert the machine plug into the machine socket.
2
Insert the power supply plug into the wall outlet.
3
Turn the power switch on.
4
Power switch
q
Machine plug
w
Machine socket
e
r
Power supply plug
t
Wall outlet
NOTE:
Before connecting to the power supply, make sure the
voltage shown on the machine conforms to your
electrical power.
WARNING:
While in operation, always keep your eyes on the sewing
area, and do not touch any moving parts such as the
thread take-up lever, flywheel or needle.
Always turn off the power switch and unplug from the
power supply:
- when leaving the machine unattended.
- when attaching or removing parts.
- when cleaning the machine.
Do not place anything on the foot control, otherwise the
machine will run intermittently.

Controlling the Sewing Speed

Foot control
Sewing speed can be varied by the foot control.
The harder you depress the foot control, the faster the
machine runs.
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Explore 340

Table of Contents