Information Available During A Build - Stratasys Fortus 900mc User Manual

Hide thumbs Also See for Fortus 900mc:
Table of Contents

Advertisement

INFORMATION AVAILABLE DURING A BUILD

The following information is displayed while building a job:
Figure 4-21:
A
B
G
A.
The name of the previous job built.
B.
Estimated time to build the job, materials used, tips, and layers.
C.
Percentage of job completed.
D.
Finished time, elapsed time displayed in hours and minutes, slice and number of layers.
E.
Oven temperature.
F.
Presence of vacuum.
G.
Indicate the amount of model material that is available relevant to the current job. If there is
enough material for the current build, the blue arrow will be at the top of the percentage
completion window.
H.
Indicate the amount of support material that is available relevant to the current job. If there is
enough material for the current build, the brown arrow will be at the top of the percentage
completion window.
Job Information
C
68
D
E
F
H

Advertisement

Table of Contents
loading

Table of Contents