2 Planning the Installation
NOTE:
The GUI illustrations in this guide were created using a Windows computer with the
Internet Explorer browser. Actual windows may differ depending on the operating system and
browser used. GUI contents also vary with licensed program products, storage system models,
and firmware versions.
Responsibilities
The responsibilities for installation planning are shared by the customer and Hewlett Packard
Enterprise support. The required installation planning tasks must be scheduled and completed
to ensure successful and efficient installation of the P9500 disk array.
NOTE:
The P9500 disk array must be installed by trained Hewlett Packard Enterprise personnel
or trained Hewlett Packard Enterprise Technical Support. The P9500 disk array is not a customer
installable product.
User Hewlett Packard Enterprise
You are responsible for performing the following tasks to prepare for installation of the P9500
disk array.
Understand the applicable safety requirements associated with installing a P9500 disk array.
Understand the installation requirements for the P9500 disk array. You can use the information
in this manual to determine the specific requirements for your installation. As needed, review
the P9500 user and reference guide to familiarize yourself with the components, features,
and functions of the P9500 disk array.
Verify that the installation site meets all installation requirements. A checklist is included in
this section to help you with this task.
Provide electrical hardware, including cables, connectors and receptacles that are required
to connect the P9500 disk array to site power.
As needed, work with Hewlett Packard Enterprise support to create an installation plan.
Allow enough time to complete any changes to the plan, so your site is ready when the
equipment arrives.
Hewlett Packard Enterprise responsibilities
Hewlett Packard Enterprise support is responsible for completing the following tasks:
Assist you as needed during the installation planning process for your specific site and
operational configuration
Coordinate Hewlett Packard Enterprise resources to ensure a successful installation and
configuration of the P9500 disk array.
Responsibilities
11