Site Planning Timetable - HP StorageWorks XP128 Installation Manual

Hide thumbs Also See for StorageWorks XP128:
Table of Contents

Advertisement

Site planning timetable

18
The following guidelines can be used to monitor the progress of your
pre-installation preparation. The time between placing an order and actual
arrival can vary, and we recommend conferring with your HP
representative to determine the best estimated delivery dates for preparation
of your site.
The following are items that may require several weeks of lead time to
complete:
• Acquiring required power connectors
• Arranging for an electrician
• Adding or modifying air conditioning
• Building alterations
• Placing an order for data comm equipment
Due to potential delays, we recommend that the suppliers of the listed
services be contacted as soon as you have placed your order:
• Schedule the site planning visit with your HP CE to discuss questions
concerning site planning.
• Select an appropriate location for the disk array and create a plan
outlining the physical arrangement of the equipment, including related
furniture.
HP StorageWorks Disk Array XP128: Site Preparation Guide

Advertisement

Table of Contents
loading

Table of Contents