HP HPE XP P9500 Manual page 13

Hide thumbs Also See for HPE XP P9500:
Table of Contents

Advertisement

Installation Planning Checklist
Is the receiving area adequate for equipment delivery and unloading? (Can the area handle
crated equipment at least 90 in./2.29 m high?)
Are all doors, hallways, elevators, and ramps wide enough and high enough to allow the
equipment to be moved from the receiving area to the installation area?
Can the floors, elevators, and ramps support the weight of the equipment?
Storage Requirements
If the equipment will be stored after delivery and prior to installation, does the storage
location meet the environmental requirements for storing a P9500 disk array?
Facilities Requirements
Does the data center provide appropriate fire protection for computer equipment such as
P9500 disk arrays?
Does the data center have a raised floor?
Does the location meet the requirements for service clearance and cable routing (for example,
floor cutouts)?
Does the location meet the floor load rating requirements?
Power Requirements
Does the data center meet the AC input power requirements?
Does the data center meet the circuit breaker and plug requirements?
Is the customer supplied hardware such as connectors, receptacles, and cables ready for
the installation?
Environmental Requirements
Does the data center meet the operational temperature requirements for a P9500 disk
array?
Does the data center meet the operational humidity requirements for a P9500 disk array?
Does the data center meet the operational altitude requirements for a P9500 disk array?
Does the data center meet the air flow requirements for a P9500 disk array?
Does the data center provide adequate protection from ESD?
Does the data center provide adequate protection from electrical/radio frequency
interference?
Does the data center provide adequate protection from dust, pollution, and particulate
contamination?
Does the data center provide adequate acoustic insulation to operate the P9500 disk array?
Operational Requirements
Does the data center provide a LAN for Remote Web Console?
hb-Is the infrastructure available for the default Internet based remote support solution?
Does the location meet the cable length requirements for the CHAs?
Does the location meet the requirements for attaching external storage?
Yes
No
.
.
Installation planning checklist
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents