PIAGGIO X7 250ie Service Station Manual page 182

Hide thumbs Also See for X7 250ie:
Table of Contents

Advertisement

Injection
Check the power supply line of the injection load
remote control energising coil: after switching to
«ON », make sure there is battery voltage, for 2
seconds, between the Red-Green cable and the
Black-Purple cable of the remote control base. If
there is not, check the continuity of the Red-Green
cable between the fuse box (fuse No. 8) and the
remote control base and of the Black-Purple cable
between pin 20 of the ECU and the remote control
base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT
WITH THE COMPONENTS DISCONNECTED.
(REMOTE CONTROLS, CONTROL UNIT,
FUSES ETC.).
Check if there is steady voltage between the Or-
ange-Blue cable of the remote control base and
the ground lead. If there is not, check the continuity
of the Orange-Blue cable between the fuse box
(15A fuse No. 5) and the remote control base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT
WITH THE COMPONENTS DISCONNECTED.
(REMOTE CONTROLS, CONTROL UNIT,
FUSES ETC.).
INJEC - 32
Downloaded from
www.Manualslib.com
manuals search engine
X7 250ie

Advertisement

Table of Contents
loading

Table of Contents