IBM N7800 Hardware And Service Manual page 110

Table of Contents

Advertisement

2. Take one of the following actions, depending on the result of the storage
3. Take over the target node by entering the following command from the partner
4.
5. Turn off the power supplies and disconnect the power on the target node.
Shutting down the node in a stand-alone system
For a node that is not configured with a high-availability (HA) partner, you must
perform a clean shutdown (ensuring that all data has been written to disk) and
disconnect the power supplies.
Procedure
1. Enter the following command from the system console:
84
IBM System Storage: N7000 Series Hardware and Service Guide
For...
7-Mode
Cluster-Mode
failover show or cf status command:
If...
Neither node is in takeover mode
The partner node took over the target node
The target node took over the partner node
node's console:
For...
7-Mode
Cluster-Mode
If you are not already grounded, properly ground yourself.
If your system uses...
AC power
DC power
If your system is configured in...
7-Mode
Cluster-Mode
After you issue the command, wait until the system stops at the LOADER
prompt.
Issue the command...
cf status
storage failover show
Then...
Go to the next step in this procedure.
The target node is in a state where you can
shut it down; go to the next step in this
procedure.
1. Correct the problem that caused the
takeover.
2. Run the storage failover giveback or
cf giveback command from the target
node console.
3. Go back to the beginning of this
procedure.
Issue the command...
cf takeover
storage failover takeover -bynode node
Then...
Unplug the power cords from the power
source, and then remove the power cords.
Remove the power at the DC source, and
then remove the DC wires, if necessary.
Then issue this command...
halt
halt local

Advertisement

Table of Contents
loading

This manual is also suitable for:

N7600N7900N7700

Table of Contents