Hague Quality Water Maximizer 400 Installation And Service Manual page 7

Table of Contents

Advertisement

I I n n s s t t a a l l l l a a t t i i o o n n S S t t e e p p s s a a n n d d S S t t a a r r t t - - U U p p P P r r o o c c e e d d u u r r e e s s
We recommend that you have your water treatment specialist install and maintain this appliance.
Each water treatment appliance comes with 8 feet (2.4 metres) of drain line.
P P r r e e p p a a r r e e t t h h e e P P l l a a c c e e m m e e n n t t A A r r e e a a
STEP 1
A. Clean the placement area.
B. Turn off the electricity and water supply to the water heater. For gas water heaters, turn the gas
cock to "PILOT."
C. Examine the inlet plumbing to ensure that the pipe is not plugged with lime, iron, or any other
substance. Clean or replace plugged plumbing.
Figure 1: Appliance Placement (With Optional Built-in Bypass)
Note: Your appliance may come with an optional bypass that enables you to remove the appliance
from service when necessary. Should your appliance NOT have the bypass, a bypass valve like
Figure 2 may be available from your local hardware store or install three-way bypass plumbing simi-
lar to Figure 3.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents