Commissioning; Requirements For Commissioning; Basic Commissioning - Initial Startup - Siemens Simatic box pc 627b Operating Instructions Manual

Table of Contents

Advertisement

Commissioning

7.1

Requirements for commissioning

7.1
• Connect the peripherals, such as the keyboard, mouse, monitor and the power supply,
• The operating system of your device is preinstalled on the hard disk.
7.2

Basic commissioning - initial startup

7.2
The PC operating system is automatically set up the first time you switch on the device.
Procedure:
1. Set the ON / Off switch to I position (On). The PC performs a POST. During the self-test,
this message appears:
Press <F2> to enter SETUP or <ESC> to display the boot menu
2. Wait until this message is cleared, then follow the instructions on the screen.
3. Type in the Product Key as required. You find this key on the "Certificate of
Authentication", in the "Product Key" line.
Notice
The PC may not be switched off when you run setup.
Do not change the default BIOS settings, otherwise the operating system setup may become
corrupted.
4. Automatic restart
SIMATIC Box PC 627
Operating Instructions, Release 05/2006, A5E00362052-03
before putting the device into operation.
Caution
Risk of damage to the device!
Make sufficient allowances for the device to acquire room temperature before you put it
into use. If condensation develops, wait at least 12 hours before switching on the device.
7
7-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic box pc 627

Table of Contents