Commissioning

6.1

Requirements for commissioning

● Before you switch on the device, you should verify that all peripheral devices such the
● The operating system of your device is preinstalled on the hard disk.
6.2

Initial Commissioning - Initial Startup

The Rack PC operating system is automatically set up the first time you switch on the
device. Procedure:
1. Press the on/off button. The green power LED lights up. The PC performs a POST.
2. Wait until this message is cleared, then follow the instructions on the screen.
3. Type in the Product Key as required. You find this key on the "Certificate of
4. Automatic restart
After you have entered all necessary information and after the operating system
setup is completed, the PC is automatically restarted and displays the user interface of the
relevant operating system.
From now on, after you switch on the PC, the user interface of the operating system is
automatically opened when the startup routine is completed.
SIMATIC Rack PC 647B
Getting Started, 12/2008, A5E02147333-01
keyboard, mouse, monitor and the power supply are connected.
CAUTION
Risk of damage to the device!
Make sufficient allowances for the device to acquire room temperature before you put it
into use. If condensation has developed on the device wait at least 12 hours before you
switch it on.
During the self-test, this message appears:
Press <F2> to enter SETUP
Authentication", in the "Product Key" line.
NOTICE
The PC may not be switched off when you run setup.
Do not change the default BIOS settings, otherwise the operating system setup may
become corrupted.