WDS
Operation, Maintenance and Installation Manual
3.1
URINE BOTTLE / BEDPAN LOADING AND OPERATING CYCLE
LOADING
1.
To open door, use
2.
Place racks into the correct positions
Lift bedpan rack up and lock
into position.
3.
Place bedpan lids into back of Bowl rack
4.
Place first bedpan onto top rack, or large/small slipper pan.
5.
Place second bedpan onto bottom rack or large/ small slipper pan
6.
Place urine bottles into rack
ISSUE 5
3.0 UNIT LOADING AND OPERATION
Refer to laminated WDS Instructions
or press
Page
Check that bowl
rack is in the up
position
14
.
15/03/2016