First Steps To Create And Configure A Project; Ms 6 Logger; Ms 6 Programming - Bosch MS 6 Manual

Engine control unit
Hide thumbs Also See for MS 6:
Table of Contents

Advertisement

3 | Starting up the MS 6 system
3.2.1
24 / 78

MS 6 Logger

2
core area for the tool displayed parts like logger‐, lap trigger, telemetry and
nd
CAN‐network configurations. Application work will be done in the predefined
function windows of RaceCon.

MS 6 Programming

System programming or flashing of the device has to be done with the system
configuration tool of Bosch Motorsport RaceCon. After the start of the tool Race‐
Con opens a view Welcome to RaceCon.
With Last Projects former projects can be opened directly.

First Steps to create and configure a Project

File / New / RaceCon Project: opens a new project in RaceCon.
Main Area
Project
Tree
Data Area
Properties
Message Area
To create a new vehicle configuration, the devices can be pushed via drag &
drop from the toolbox to the vehicle. Then they are part of the project and can
be configured.
Select an ECU model MS 6 from the Toolbox / Devices / ECUs.
Drag the ECU icon with pressed left mouse click on the vehicle view, then a dia‐
log opens.
ECU MS 6
Toolbox
Bosch Motorsport

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents