Assembly - DeDietrich GT 123 A Installation And Maintenance Manual

Oil-gas fired hot water boiler
Table of Contents

Advertisement

The assembly of any options delivered with the boiler is described in
the instructions accompanying the options. The list of available
options is indicated in the price list in force.
Step one
Removing the front panel
Lift the window.
Unscrew the two front panel side attachment screws.
Unclip the front panel from the clips and notches near the top,
and pull it towards you.
Remove the front panel from the notches in the bottom of the side
panels.
Step two
Reverse the direction of opening of the burner door if necessary
(opening at left)
When the burner leaves the factory, the burner door opens towards
the right. To open the burner door towards the left (if necessary):
- remove the front cap, then
- perform following operations: 2.1, 2.2 and 2.3.
Loosen the 2 top and bottom nuts.
Remove the lower and upper hinges.

Assembly

2
3
4
2.1
1
2
3
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 125 aGt 124 aGt 126 a

Table of Contents