DeDietrich GT 123 A Installation And Maintenance Manual page 16

Oil-gas fired hot water boiler
Table of Contents

Advertisement

Step ten
Assembly of the front panel and the top cover
- Assembly of the front :
Lift the window.
Attach the front panel in the openings in the bottom of the side
panels.
Engage the front panel in the clips and the notches of the side
panels.
4
16
5
1
3
2
Put the two attachment screws located on the side panels into
place.
- Assembly of the top cover:
Put the cover back into place and fix it using two screws +
serrated washers (delivered in the cladding instructions pack).
4
3
GT 120 A - GT 1200 A
09/02/08 - 94863361 - 85784009D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 125 aGt 124 aGt 126 a

Table of Contents