DeDietrich GT 123 A Installation And Maintenance Manual page 11

Oil-gas fired hot water boiler
Table of Contents

Advertisement

Levelling the tank
- Level the tank using the adjustable feet.
3/8
Base measurement 1
,
3/8
9/16
Adjustment from 1
to 1
Fixing the boiler on the DHW tank
Using gloves, lift the boiler using 2 ø3/4" tubes placed as shown in
the drawing, or with the two handles on the lower part of each side of
the boiler.
GT 1203/160
GT 1204/160
Boiler
GT 1205/160
GT 1205/250
GT 1206/250
1/8
P (in)
11
09/02/08 - 94863361 - 85784009D
possible.
GT 1206/160
1/2
6
GT 120 A - GT 1200 A
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 125 aGt 124 aGt 126 a

Table of Contents