Figure 4: Connecting Ac Power - Edge-Core ECS3510-26P Installation Manual

26-port layer 2
Hide thumbs Also See for ECS3510-26P:
Table of Contents

Advertisement

Chapter 2
| Installation Overview
Switch Installation Tasks
Task 3
Task 4
Connect AC Power to Power On
Connect the power cord to the AC socket on the switch and to a grounded, 3-pin,
AC power source.
Go to the chapter

Figure 4: Connecting AC Power

1
Supplied AC Power cord.
Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PWR and DIAG LEDs should both be on green. If any
of the LEDs are on amber, see
Go to the section
"Power and Grounding"
1
2
"Diagnosing LED Indicators" on page
"Understanding the System Status LEDs" on page 42
– 16 –
Connect an external AC power source
to the AC power socket of the switch
using the supplied AC power cord.
46.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents