Figure 2: Rear Panel - Edge-Core ECS3510-26P Installation Manual

26-port layer 2
Hide thumbs Also See for ECS3510-26P:
Table of Contents

Advertisement

Figure 2: Rear Panel

1
1
Reset Button
2
Grounding Point
Mode Button
Pressing the Mode button on the front panel will change the Diag LED and the PoE-
enabled port LEDs to display PoE status. For more information, see
the System Status LEDs" on page
System LEDs
For information on system status LED indicators, see
Status LEDs" on page
42.
Port LEDs
For information on port status LED indicators, see
LEDs" on page
31.
Cooling Fans and Vents
The switch must be installed in a properly cooled and ventilated environment. For
more information. For more information, see
page
23.
AC Power Socket
The switch requires a 100-240 VAC, 50-60 Hz AC power source. For more
information on the switch power input, how to connect it, and how to power-on
the switch, see
"How to Connect to AC Power" on page
Grounding Terminal
The switch includes a grounding terminal that must be connected to a ground
source that provides local earth potential. For more information, see
the Chassis" on page
26.
42.
3
AC Power Socket
"Switch Cooling Requirements" on
– 11 –
Chapter 1
| Switch Description
"Understanding
"Understanding the System
"Understanding the Port Status
2
27.
"Grounding
Overview
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents