Steering Cable - Starboard Side Routed Cable - Mercury 75 Operation Maintenance Warranty Installation Manual

Hide thumbs Also See for 75:
Table of Contents

Advertisement

2. Thread the lifting eye into the flywheel hub for a minimum of five turns.
Lifting Eye
3. Connect a hoist to the lifting eye.
4. Lift the outboard and place it on the boat transom.
Steering Cable ‑ Starboard Side Routed Cable
1. Lubricate the O‑ring seal and the entire cable end.
95
Tube Ref
Description
No.
2-4-C with PTFE
95
OUTBOARD INSTALLATION
2756
O-ring seal and entire cable end
Threads into the flywheel to remove the
powerhead assembly from the
driveshaft housing, or to lift entire
engine for removal/installation.
Where Used
122
15363
91‑90455‑‑1
3724
Part No.
92-802859A 1
eng

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9080 jet115115 pro xs125 optimax

Table of Contents