Mercury 75 Operation Maintenance Warranty Installation Manual page 80

Hide thumbs Also See for 75:
Table of Contents

Advertisement

3. Position the fuel line primer bulb so the arrow on the side of the bulb is
pointing up. Squeeze the fuel line primer bulb several times until it feels
firm.
4. Set the lanyard stop switch to "RUN" position. Refer to General
Information ‑ Lanyard Stop Switch.
5. Shift the outboard to neutral ("N") position.
6. For the initial start of a new engine, or for an engine that ran out of fuel or
was drained of fuel, the fuel system should be filled as follows:
a. Squeeze the fuel line primer bulb until it feels firm.
b. Turn the ignition key switch to the "ON" position for three seconds.
This operates the electric fuel pump.
c. Turn the ignition key switch back to the "OFF" position, and squeeze
the primer bulb again until it feels firm. Turn the ignition key switch to
the "ON" position again for three seconds. Continue this procedure
until the fuel line primer bulb stays firm.
OPERATION
27348
19791
N
26838
70
eng

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9080 jet115115 pro xs125 optimax

Table of Contents